Projects

Harvest Barge - 2015
The Stena Clyde arrived into Darwin between drilling campaigns in July 2013 and Taylor Bros managed the change out of the old and new BOP Stacks.
This project involves structural modification of 35 x 40’ shipping containers and then fit out using marine panelling system for use at Casey base Antarctica.
Taylor Bros fabricates H850 and H580 Quick Release Hawser Hooks for Trelleborg Marine Systems. These hook frames are built to DNV, Lloyds, ABS and AWS standards.
CSIRO contracted Taylor Bros to supply a Clean Laboratory Container, Radiation Laboratory Container, Sample Storage Container, HAZMAT and Clean CTD Storage Container.
Taylor Bros has designed a laundry container to be fitted to the Stena Clyde Rig.
Taylor Bros is currently conducting a study of proposals for an accommodation upgrade to the Stena Clyde oil rig.
In October 2013, Taylor Bros completely removed the linings, furniture and flooring of the Mess and TV Room on-board the Stena Clyde and refurbished the public spaces including the addition of a
Project Management of the accommodation works, supply of materials, including pre fabricated furniture and bathroom modules, supply of all required electrical equipment, fittings and fixtures and the fitting of wall and ceiling panels, floors, furniture and equipment.
In 2007 and 2008, Taylor Bros completed work on upgrades to accommodation spaces for HMA Ships Kanimbla and Manoora.